Tuesday, September 17, 2013

The home building process

A few days after Mason was home from the hospital we started on the home building! The plan and design we decided on was a two story home with a walk out basement. The home will have 3 bedrooms on the top floor with a kids loft(TV/toy room), a computer desk, and 1 Full Bathroom. The main floor will have the master bed room and bath, an office, mudroom, laundry room, a half bathroom, family and dinning room and kitchen. The basement will have another bedroom, lots of storage space, a future exercise room,a future family room, craft room and kitchenette. The first dig began on Tuesday, August 13th! This kids were able to go with Tim and I to the lot. The excavator let Tim have Allie and Mason in the machine with him, as they dug the first hole for the footings! What a excitement for our family! It really started to feel real, at that moment!


Our Lot in Steadman Estates 

Tim measuring out the footings for the digging to begin

Me holding up the plans for Tim 

The kids were able to dig the first hole with Tim in the Tractor!

Pouring the cement for the drive way and basement 
We have the back walls framed

The side of main level framed


The roof an framing completed

The front porch and pillars completed

The beautiful stone steps that Tim's buddy created for our side yard!
Update 10/21/2013:The roof is on, windows on, plumbing and electrical is in 

Updated: 10/21/2013: The back of the house

No comments: